3 days in

In. 3 long days of work, the team has removed the old kitchen fixtures, stripped the walls back to the studs, added on to the wall studs, insulated to R20, removed the supporting wall and replaced it with a beam, and opened  the wall up in to the living room.

image

image

image

image

Today they focused on plumbing and electric. They roughed in services for the upstairs bathroom, wired light switches and recepticals and got a start on the kitchen plumbing.

image

image

Tomorrow is the rest of the plumbing and electric then on to finishing the room.

image

My living space gets smaller everyday. I’ve been out to dinner 3 nights at various neighbours.

Good news on the flooring front today as well. The linoleum and subfloor seem to be lifting nicely and the original floors look great. It looks like I’ll be able to salvage them.

Advertisements

One response to “3 days in

  1. Thanks for posting the pictures, it’s going to be great!!!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s